The commissioning of the ultrasonic flow meters in Turkey's largest hydroelectric power plant Yusufeli Dam has taken place from Rittmeyer, which we are the distributor.

🎉 Another Major Achievement! 🎉

Together with our partner Rittmeyer, we have successfully completed the commissioning of the ultrasonic flowmeter system installed at Yusufeli Dam, Turkey’s largest hydroelectric power plant.

For each unit, velocity measurements were taken at 8 planes, with a total of 48 sensors (16x3), enabling flow measurement with an accuracy of better than 1%. Following the introduction of water into the system, the flowmeters in all 3 units began operating flawlessly. This high-tech solution sets a new standard in precision for flow measurement in hydroelectric energy generation.

📌 We would like to express our sincere gratitude to Joerg Heinrich for his valuable supervision during the completion and commissioning of the project.

AQUADATA – Where Hydrology Meets Technology... 💧💻

Yusufeli Dam Hydroelectric Power Plant Ultrasonic Flow Meter Installation 2 1 Yusufeli Dam Hydroelectric Power Plant Ultrasonic Flow Meter Installation 2 2 Yusufeli Dam Hydroelectric Power Plant Ultrasonic Flow Meter Installation 2 3 Yusufeli Dam Hydroelectric Power Plant Ultrasonic Flow Meter Installation 2 4 Yusufeli Dam Hydroelectric Power Plant Ultrasonic Flow Meter Installation 2 5 Yusufeli Dam Hydroelectric Power Plant Ultrasonic Flow Meter Installation 2 6

International Representatives

  • Rittmeyer Brugg